Search

Oakhill College – Exciting New Innovation Hub

After many months of planning, it is our pleasure to announce that our DA has been approved for our exciting Innovation Hub and learning precinct. Oakhill College

The Innovation Hub boasts state-of-the-art technology and science labs, hybrid workshops and large multi-purpose spaces designed to encourage a collaborative approach to learning imperative to maintain our exceptional educational outcomes.

We are thrilled that these upgrade projects will assist our dedicated teachers and provide our students, and families in the area with high-quality facilities now and well into the future. Oakhill College

In addition, the re-landscaping of the entire centre of the campus, the hilltop at the top of Oakhill Drive, will mean all teaching spaces will open onto a central learning precinct linking all buildings with covered walkways, new hard surface and green areas, in addition to ramped walkways to lower levels.

We have been working closely with our Project Managers, Mostyn Copper, and BVN Architecture, regarding the Innovation Hub, and URBIS regarding landscape design, both of who have produced inspirational spaces for staff and students to enjoy. As a timber construction, VIRIDIS will work alongside the soon to be named successful building tenderer.

Site development is expected to start in July 2021 and be completed in July 2022, with landscaping completed in Term One, 2022. Oakhill College Oakhill College

Table of Contents